Your Vision
Our Mission

ΕΤΗΝΟΚΑΤ offers high quality services in the field of construction and renovation of hotel facilities, business buildings and luxury residences.

Since 2006, we have been constructing and renovating buildings of high aesthetics and premium quality, always focusing on the speed of delivery and the profitability of our customers. We specialize in the construction of luxury hotels and residences and so far we have completed a significant number of renowned projects that reflect our passion, consistency and attention to detail.

PROJECTS THAT REPRESENT OUR STANDARDS

Euphoria Retreat

Location: Mistras
Budget
: 17.000.000 €
Duration: 15 Months

A 3,000 m² wellbeing spa with outstanding functional details, such as a spherical indoor heated swimming pool, kneipp, watsu, dipping, tepidarium, an ice fountain, 3 saunas, a steam room, a byzantine hammam, several relaxation rooms, and several yoga-pilates-exercise rooms.

TUI Sensimar Meltemi Blu

Location: Santorini
Budget: 11.200.000 €
Duration: 8 Months

Construction of the 105-rooms TUI Sensimar Meltemi Blu hotel complex in Santorini. The hotel facilities include jacuzzi in every room and spa and 4 exterior and 1 interior swimming pools.

TUI Sensimar Insula Alba Resort & Spa

LocationChersonisos, Crete
Budget
: 8.300.000 €
Duration: 7 Months

Construction of seven steel-frame room buildings and one steel-frame main building, with 5-star standards. The hotel includes 138 rooms, seven swimming pools, one of which is indoors and heated, two bars, a spa, a restaurant and two kitchens.

Marriott Metropolitan

Location: Athens
Budget
: 3.200.000€
Duration: 3 Months

Renovation of the public spaces of the METROPOLITAN hotel according to the  MARRIOTT standards. The focal point of the renovation was the cladding of the existing, 6m high columns with solid marble.

Double tree by Hilton

Location: Kos
Budget
: 28.000.000 €
Duration: 12 Months

The second Greek hotel by Hilton features 13 apartment buildings with 250 rooms in total, fitness facilities, spa, bar, 25 outdoor swimming pools, 3 autonomous villas and various outdoor facilities.

WHAT MAKES US STAND OUT:

We know all about solid foundation

Our experience, our passion and the knowledge of our partners are our driving force and the foundation of every successful project.

We don’t waste time

Our organization skills and speed are unparalleled. We understand the importance of time for our clients and we make sure that we complete each project in the time that favors their business.

We take matters personally

From management to our partners, we are all passionate about the details, through checking and inspecting every stage of the construction. For us, each project is our own.

HIGHLIGHTS FROM THE CONSTRUCTION YARD

SPIDER

Cladding of 6-meter columns with semicircular sections of solid marble with beads. Weight 700kg per item.

SPIDER

Placement of glass panes for the reception area.

SPECIAL SWIMMING POOL PAINT

Surface coating of wet floors and walls by thermo-polymer Aquabright in a shade color relevant to the client’s color palette.

SPECIAL SWIMMING POOL PAINT

Surface coating of wet floors and walls by thermo-polymer Aquabright in a shade color relevant to the client’s color palette.

COMPOSITE CONSTRUCTION

Construction of composite building having a steel frame of various sections and dry walls.

COMPOSITE CONSTRUCTION

Construction of composite building having a steel frame of various sections and dry walls.