BSH factory, Agios Ioannis Rentis
Location: Agios Ioannis Rentis
Owner: BSH Pitsos
Budget: 567.850 €
Duration: 2 Months
Assignment: 21/09/2006
The scope of the project was the replacement of the old 4,000 m² roof, that was made of asbestos, with a new one, made of polyurethane panels. All the works were conducted while the factory was in operation, so a temporary roof was constructed to ensure the safety of the workers. During the process, a team of experts equipped with the appropriate instruments ensured that the asbestos fibers content in the air did not exceed the permitted levels.